TCR World and life
7 Seven months to develop the battery pack Williams Advanced Engineering has designed, built and developed a bespoke battery pack for ETCR in just seven months, from initial feasibility work through to in-vehicle testing. The project began in May 2019 and two months later, cell and prototype module tests were already under way. Extensive Computational Fluid Dynamics and Finite Element Analysis simulations were run in September 2019, allowing for manufacture in December culminating in physical testing to validate a full race season. The 798V battery pack provides a peak power of 500kW and 300kW continuous power with a 62kWh capacity. The high power cylindrical cell battery can be re-charged in less than an hour from 10% to 90% at 60 kWh. The pack will also allow four “push-to-pass” events over the 21-minute race distance. Through extensive FEA analysis the composite-made enclosure has been designed to provide an electrical barrier against Electro-Magnetic Current and survive a 50g crash simulation. CFD thermal analysis was performed at both cell and pack level to model in detail the thermal characteristics of the battery pack in order to optimise cooling and weight efficiency. All electrical testing on-site was completed using one of the largest Kratzer and AV900 simulators in the UK and every battery manufactured goes through end of line trials to verify production build quality.
Made with FlippingBook
RkJQdWJsaXNoZXIy MjU2MTI=